TP Logo
 Staff & Student Sign in   News & Events   Sitemap   Feedback   Contact Info 
Temasek Engineering School
     
 
Our Team
Past Projects
Current Projects

 
Current Projects

Project Management for Integrated Resorts Multi-Complex

To use a Computer Aided Design software to perform data management for building drawings and project details used by various parties involved in building the integrated resorts multi complex.

Facility Design of Integrated Resorts

To perform collaborative work with a consultant firm to undertake the facilty design in mechanical and electrical services of integrated resort and commercial buildings.

Optimization of Terrace Space

To study the conversion of a terrace space into a functional area to achieve cost optimization and maximum space utilization including the design the of terrace area and its access.

Study on Accessibility in Public Buildings

To study the current practices and technical aspects of accessibility as well as other key issues pertaining to barrier free accessiblity within the built environment using data generated from site surveys of existing public buildings including shopping complexes, office buildings and polyclinics.

Energy Audit and Building Survey

To propose energy cost reduction measures by studying present energy usage in facility by conducting interviews with site operating personnel, performing analysis on energy consumption pattern and reviewing operating procedures.

Event Management for Great Singapore & Food Festival

To improve crowd-drawing to major events in shopping malls which includes gathering responses from tenants for promotions and food festival and setting up on-site operations for promotions.

Analysis of building water consumption & improvement of lighting at malls

To study ways to reduce water and lighting energy consumtpion in a shopping mall by analysing data collected at various strategic locations within the mall area.

Barrier Free Access in the Residential/Neighbourhood Complex

To work towards the accessible environment for the independent living of people of varying abilities in residential and neighbourhood complex through a good appreciation of the broad range of abilities or disabilities of all user groups in the community.

School Facilities Management

To assess and improve the facilty management practices and quality processes of facilities' Managing Agents' (MA) works conducting on-site cleaning energy, building lighting and structure audits.

Improvement on the Establishment and Management of Data Centre

To apply project management on the erection of a new data centre, review and improve day-to-day operation and conduct energy management for data centre

Print thisPrint this  Email thisEmail this 

 
About Us     |     Courses    |     Showcase    |     Experience    |     Industry    |     TP Students    |     Alumni   
Staff & Student Sign in   |   News & Events   |   Sitemap   |   Feedback   |   Contact Info  
Privacy Statement|Terms of Use   Copyright 2008 Temasek Polytechnic. All Rights Reserved.