Student Portal   News & Events   Sitemap   Feedback   Contact Info 
   
TP Logo School of Engineering
     
ENG School - Close ties with Industry
 
AWAK
Fuel Cell Bicycle
Passenger to Freighter Conversion
Fuel Cell Test Station
Virtual Aero Engine
i-Learning Module
Solar Energy Can Crusher
PEM Fuel Cell Monitoring and Analysis System
Process Improvement Strategies
SBS Transit Ltd Simulation Project
Mobile Electronic Programme Guides (EPG)
Casualty Evacuation Robot
Self-Regulating Hydrogen Generator
SkyRags
Elderly Monitoring System
SMRT e-Learning Package
Foreign Worker Authentication System
Perimeter Protection System
Collaborative Treasure Hunt
Food Dryer System

 
Process Improvement Strategies

This project used the DMAIC methodology for continuous improvement of existing processes.

The main objective was to achieve a win-win business strategy between Motorola and Jurong Hi-Tech (JHT) through Back End (BE) cycle time improvement without compromising the quality of the assigned 47N07 and 47N05/N06 modules.

Furthermore, this project aimed to establish a lean transformation program to JHT (Malaysia) modules operation.

Key Features

  • Process modification/simplification
  • Batch size optimization
  • Process benchmarking
  • Reduced 47N07 & 47N05/N06 module BE cycle time by 16.2% & 33.3% respectively
  • Improved 47N05/N06 ink mark quality in terms of rework percentage from 10% to 0.1%
  • Additional revenue of >S$1M per year
  • Reduced 47N05/N06 headcounts and achieved cost saving of S$24K per year

Process Improvement Strategies

Process Improvement Strategies

Process Improvement Strategies

Part of JHT BE Modules Operation

 
Print thisPrint this  Email thisEmail this 

 
About Us     |     Courses    |     Showcase    |     Experience    |     Industry    |     TP Students    |     Alumni   
Student Portal   |   News & Events   |   Sitemap   |   Feedback   |   Contact Info  
Privacy Statement|Terms of Use      Copyright 2011 Temasek Polytechnic. All Rights Reserved.